亚洲肥老太bbw中国熟女-亚洲二区在线视频-亚洲二区在线观看-亚洲二区精品婷婷久久精品-亚洲都市校园激情另类-亚洲动作一

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16141

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 久久视精品 | 久久久国产精品成人片 | 国产欧美一区二区三区不卡 | 狠色鲁很很鲁在线视频 | 国产99久久久国产无需播放器 | 久久精品国产亚洲麻豆 | 亚洲欧美精品综合在线观看 | 国产无人区卡一卡二卡三乱码免费版下载 | 欧美人成在线观看 | 无码AV久久久久久久久 | 久久久这里只有免费精品2024 | 精品久久久无码21p发布 | 国产又色又爽又黄又免费软件 | 国产精品精品视频一区二区三区 | 91尤物国产尤物福利 | 国产成人无码一区二区三区 | 四虎永久在线精品免费观看 | 亚洲欧美偷拍另类a∨色屁股 | 国产精品亚洲日韩欧美色窝窝 | 亚洲蜜桃精久久久久久久久久久久 | 欧美精品无码一区二区三区老鸭窝 | 特级做A爰片毛片免费看无码 | 伧理片午夜伧理片毛片日本 | 国产婷婷在线精品综合 | 国产无人区码卡二卡3卡4卡高清在线观看 | 人妻无码中文激情 | 日韩人妻鲁交色情精品视频 | 亚洲AV成人无码一二三区在线 | 四虎影在永久在线观看 | 国产精品扒开腿做爽爽爽A片软件 | hezyo加勒比在线综合 | 国产成人三级一区二区在线观看一 | 国精产品一品二品国精品69XX | 国产麻豆精品乱码一区 | 欧美成人无码A区在线观看免费 | 成人全黄三级视频在线观看 | 综合玖玖| 国产人妻一区二区无码 | 欧洲成人在线观看 | 亚洲精品中文字幕乱码 | 欧美性1生交XXXXX无码 |